
Nitto Denko Vietnam Factory. Phase 6
- Function:
- Industrial: Factory
- Construction grade:
- Private
- Time - Location:
- 2022 · No. 6 VSIP Street No. 3, VSIP Industrial Park, Binh Hoa Ward (former Thuan An), Ho Chi Minh City
- Gross floor area (GFA):
- Private
- Total investment:
- Private
- Investor:
- NITTO DENKO
KTEST's role

Project overview
Located in Vietnam – Singapore Industrial Park (VSIP I), Binh Hoa Ward, Ho Chi Minh City, the Nitto Denko Vietnam – New Phase 6 Factory and Phase 5 Expansion, developed by Nitto Denko Vietnam Co., Ltd. (Nitto Denko Corporation, Japan), is a key high-tech electronic component manufacturing complex. Commencing construction in 2022–2023, the project was completed and officially put into operation in 2024 to expand production scale and enhance global supply capacity. Built with modern technical infrastructure meeting stringent Japanese cleanroom and automation standards, the facility specializes in manufacturing flexible printed circuits, optical materials, and precision electronic components.
Free consultation
Construction investment project procedures checklist
A summary of the legal procedures required at each project stage, with the current legal basis. Leave your details for advice tailored to your needs.